Package-on-Package (PoP) Warpage Characteristic and Requirement
Published: |
December 16, 2021 |
Author: |
Wei Keat Loh, Ron Kulterman, Tim Purdie, Haley Fu, Masahiro Tsuriya |
Abstract: |
Package-on-Package (PoP) technology is widely used in mobile devices due to its simple design, lower cost and faster time to market. Warpage characteristic and requirement of PoP package becomes critical to ensure both the top and bottom package can be mounted with minimal yield lost. With this challenge in placed, iNEMI has been working relentlessly to fingerprint the current PoP package technology warpage characteristic and to establish some key learning for packaging technologies. The work also extended to understand the basic requirement needed for successful PoP stacking by analyzing the warpage data obtained and formulate a simple analytical equation to explain the true warpage requirement for PoP packaging.... |
You must be a registered user to talk back to us. |
Company Information:
More articles from Intel Corporation »
- Jan 06, 2021 - Challenges of Manufacturing with Printed Circuit Board Cavities
- Dec 12, 2019 - Voids in Solder Joints
- Oct 08, 2015 - Preparing for Increased Electrostatic Discharge Device Sensitivity
- Apr 16, 2015 - Stereo Vision Based Automated Solder Ball Height Detection
- May 16, 2013 - iNEMI HFR-Free PCB Materials Team Project: An Investigation to Identify Technology Limitations Involved in Transitioning to HFR-Free PCB Materials
- See all SMT / PCB technical articles from Intel Corporation »
More SMT / PCB assembly technical articles »
- Apr 11, 2022 - iNEMI Webinar 07.07.2021 - PCB Cleaning | ZESTRON Americas
- Jan 28, 2022 - Open Radio Unit White Box 5G | Whizz Systems
- Nov 10, 2021 - Understanding the Cleaning Process for Automatic Stencil Printers | ITW EAE
- Oct 20, 2021 - PCB Surface Finishes & The Cleaning Process - A Compatibility Study | ZESTRON Americas
- Oct 06, 2021 - Cleaning Before Conformal Coating | ZESTRON Americas
- Browse Technical Library »
Package-on-Package (PoP) Warpage Characteristic and Requirement article has been viewed 155 times